Stress-test the proposed design against requirements and constraints
Packaged know-how that tells an agent how to do a job well.
You might say…
“We built a solution the client loved until they tried to implement it — pressure-testing the design would have caught the constraint we'd ignored.”
What it does
Systematically challenges a proposed solution design against the original requirements, constraints, and likely implementation failure modes before build begins.
Trigger: Use after drafting the solution design and before committing to build; provide the design document and the original requirements.
I/O: Solution design + requirements + known constraints → pressure-test findings (requirement gaps, feasibility risks, suggested design amendments)
Recognise the problem?
The primitives are the commodity part. The fastest next step is a conversation about composing them into something that works for you.
Start a conversation